Welcome to Room K 101's Blog

Check out the Weekly Notes from your class

With Math ... you can do anything

Monday, April 2, 2012

Algebra Honors (Period 6 & 7)

Work Problems 7-8

To solve work problems use the following formula
work rate × time = work done
or rt = w
Work rate means the fractional part of a job done in a given unit of time.
For example if it take you 3 hours to clean up your room, what part of the job can be done in 1 hour? That's easy... 1/3
To finish a job the sum of the fractional parts of the work done must be 1.
( for one whole job completed)

Josh can split a cord of wood in 4 days. His father can split a cord in 2 days. How long will it take them to split a cord of wood if they work together?
Let x = the number of days needed to do the job together.
Josh and his father will each work x days
Using those great tables from class fill in with the information you know
Since Josh can do the whole job in 4 days his work rate is 1/4 job per day.
His father's work rate is 1/2 job per day.

**posting the TABLE HERE**

Josh's part of the job = x/4
His father's part of the job = x/2
so the sum of that would equal the job completed
OR

Josh's part of the job + His father's part of the job = Whole JOB
x/4 + x/2 = 1
Clear the equation of fractions by multiplying by the LCD
4(x/4 + x/2) = 4(1)
x + 2x = 4
3x = 4
x= 4/3
It would take them 1 1/3 days to do the job together.

Robot A takes 6 minutes to weld a fender. Robot B takes only 5 1/2 minutes. If they work together for 2 minutes, how long will it take Robot B to finish welding the fender by itself?

Let x = the number of minutes needed for Robot B to finish the work.
Robot B's work rate is 1/5.5 or 1/(11/2) = 2/11

***posting the TABLE HERE***
Robot A's part is (1/6)(2)
Robot B's part is (2/11)(2 +x)
A's part of the job + B's part of the Job = Whole JOB

1/3 + (2/11)(2 + x) = 1
Multiply by the LCD, which is 33

(33)[1/3 + (2/11)(2 + x)] = 33(1)
11 + 6(2 + x) = 22
11 + 12 + 6x = 33
6x = 10
x = 5/3
It will take 1 2/3 minutes for Robot B to finish welding.
The charts or tables for work problems look similar to the charts and tables used for other problems. The following formulas show the similarities among some types of problems you have studied

Work done by A + work done by B = TOTAL work done
Acid in solution A + acid in solutions B = TOTAL acid in mixture
Interest from banks + Interest from Bonds = TOTAL Interest
Distance by bike + Distance by car = TOTAL distance traveled

No comments: